Repairs are being carried out at the end of Jalan 5/98.
Heavy rain has caused the slope at the end of the road to collapse causing the drainage to collapse.
Repairs are being carried out at the end of Jalan 5/98.
Heavy rain has caused the slope at the end of the road to collapse causing the drainage to collapse.
At least 3 hill slope slides can be seen at hill behind the shops at our Taman.
With a drone flew by Randolf, our resident, some photos were taken from the air.
Our Jalan 5/98 slope is currently being repaired.
Due to heavy rain in December 2021, the water drainage drain collapsed and our slope was affected.
Remedial action is being taken.
With the Chinese New Year next week, residents will clean their houses and throw out unwanted items and rubbish.
The increased rubbish have been dumped here instead of their front houses.
This has caused our Taman to look rather unhygienic and unsightly.
We want residents to co-operate with our residents association to dispose your rubbish responsibility.
Due to recent heavy rain in December 2021, the rain water drainage at end of Jalan 5/98 collapsed and caused a minor land slide.
TSRA reported this problem to DBKL.
In end January 2022, sheet piles were piled into the affected slope.
Today, filling up works are being carried out.