Slope as of 24.3.2022




 19.3.2022 Capping of sheet piles with concrete 

Our Jalan 5/98 slope is currently being repaired.

Due to heavy rain in December 2021, the water drainage drain collapsed and our slope was affected. 

Remedial action is being taken. 




1 comment:

  1. This newly repaired concrete drain was able to discharge rain water into the drain. For the last few days, heavy rainfall occurred in the evening.