Slope as of 24.3.2022
19.3.2022 Capping of sheet piles with concrete
Our Jalan 5/98 slope is currently being repaired.
Due to heavy rain in December 2021, the water drainage drain collapsed and our slope was affected.
Remedial action is being taken.
This newly repaired concrete drain was able to discharge rain water into the drain. For the last few days, heavy rainfall occurred in the evening.