9.6.2022
Unclogged drain at Slope 2 today.
Slope 2 repairs have been completed today. Our gratitude to DBKL for carrying out slope repairs of Slope No. 1 and Slope No. 2.
31.5.2022
The second slope is being repaired. BRC netting, air compressor and cement have been moved here.
No comments:
Post a Comment